EVALUATION OF A COMBINED SYSTEM BASED ON AN UPFLOW ANAEROBIC SLUDGE BLANKET REACTOR (UASB) AND SHALLOW POLISHING POND (SPP) FOR TEXTILE EFFLUENT TREATMENT

Evaluation of a Combined System Based on an Upflow Anaerobic Sludge Blanket Reactor (UASB) and Shallow Polishing Pond (SPP) for Textile Effluent Treatment

Abstract Color removal from textile effluents Idler was evaluated using a laboratory-combined process based on an upflow anaerobic sludge blanket (UASB) reactor followed by a shallow polishing pond (SPP).The anaerobic reactor was fed with a real textile effluent, diluted 10-times in a 350 mg/L solution of pre-treated residual yeast extract from a b

read more

Study on the Bottom Diversion Outlets of the Three Gorges Project

Construction of the Three Gorges Project is divided into three stages.The second stage is to close the left bank main riverbed, divert the stream to the right bank open channd and build Smoothing the spillway section in the mian river bed and the powerhouse on theleft bank.The spillway section will be provided with three rows of release outlets of

read more